Quick answer
Most Huntington Hills homes are on their second or third roof. Older decking, undersized attic ventilation and decades of patched flashing change what a good quote needs to include.
Estimates by phone: (587) 804-9266 · Good Roofing · Calgary-owned since 2014 · 10-year workmanship warranty.
Good Roofing repairs, re-roofs and handles hail claims in Huntington Hills, the north Calgary community at the base of Nose Hill between Beddington Heights and Thorncliffe, with Class 4 impact-rated shingles and a 10-year written workmanship warranty on every job. Huntington Hills was established in 1967 and built out through the late 1960s and 1970s, so almost every house here has already been re-roofed at least once. That age shapes the work: older plank or plywood decking, attics vented for a different era, and chimneys, stacks and skylights flashed and re-flashed over five decades. We have coordinated 2,800+ Calgary roof installations and repairs since 2014, hold 4.9★ from 237 verified reviews, and carry $5M commercial general liability + WCB covered. Call (587) 804-9266 for a free drone inspection.
01 · Section
Quick answer — the 60-second version (citation-ready)
02 · Section
What older Huntington Hills roofs need that newer suburbs do not
- 01Decking condition. Some early homes still have plank sheathing with gaps between boards, and many plywood decks have soft spots from past leaks. Shingle manufacturers require a solid nail base for their warranty, so damaged sheathing gets replaced during tear-off. A fair quote states the price per sheet before work starts, so the number on the invoice is not a surprise.
- 02Attic ventilation. Insulation top-ups over the years often bury the soffit intake, and many attics have only a few small roof vents. Warm, moist air then condenses on the underside of the deck in winter. We measure the attic and balance intake and exhaust to the shingle manufacturer’s requirement.
- 03Low-slope sections. Covered patios, rear additions and the lower roofs on some split-level designs are often too flat for shingles. Shingling them anyway is a common source of leaks in the community. Those sections get a membrane system instead.
- 04Old layers. Some homes had a second layer of shingles nailed over the first during a 1980s or 1990s re-roof. We remove every layer down to the deck and never roof over existing shingles.
- 05Chimneys, stacks and skylights. Brick chimneys, cast-iron plumbing stacks and retrofitted skylights each need their own flashing. On a fifty-year-old house, those details have usually been patched more than once, and patched flashing is where most of the leaks we find in the area start.
- 06Eavestroughs, soffit and fascia. These often reach the end of their life at the same time as the roof. Replacing them during the re-roof saves a second set-up and lets the new drip edge and gutters line up.
03 · Section
Hail and Chinook wind at the foot of Nose Hill
04 · Section
NW or NE: one community, two quadrants
05 · Section
Insurance claims on an older Huntington Hills roof
06 · Section
How a Huntington Hills re-roof runs, start to finish
- 01Drone inspection and photo report. We fly the roof and check the attic from inside, so the quote reflects the deck and ventilation, not only the shingles. You get the photos, usually within 24 hours.
- 02Fixed written quote. It names the manufacturer, product line, impact rating, colour, underlayment, ventilation plan, and the per-sheet price for any decking replacement. We do not quote “starting at” prices.
- 03Full tear-off. Every layer comes off, the deck is inspected sheet by sheet, and damaged sheathing is replaced.
- 04Ice-and-water shield and underlayment. Ice-and-water shield goes along the eaves and into every valley, with synthetic underlayment across the rest of the deck.
- 05Install, flash and ventilate. New flashing at every chimney, wall, stack and skylight, membrane on any low-slope section, and intake and exhaust balanced to the attic.
- 06Clean-up and handover. Magnetic sweep of the lawn, driveway and flower beds, a final photo set, and your 10-year workmanship warranty in writing alongside the manufacturer’s material warranty.
